PROJECT
CADANGAN MENDIRIKAN SEBUAH VELODROME 3 TINGKAT
DAN LAIN-LAIN KEMUDAHAN DI ATAS LOT 16074
DAN SEBAHAGIAN LOT 16073, BANDAR NILAI UTAMA,
DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS.
DAN LAIN-LAIN KEMUDAHAN DI ATAS LOT 16074
DAN SEBAHAGIAN LOT 16073, BANDAR NILAI UTAMA,
DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS.
Architech : Jabatan Akitek JKR
C&S : Caw. Kej.Awam JKR
Contractor : Kelisa Murni Sdn. Bhd
Quantity Surveyor : TJ consult
I.B.S Product Used:
Precast Column : 583 nos
Precast Beam: 634 nos
Precast Hollow Core: 11,970m²
Staircase Flight &
Landing : 472 nos
CONCEPT
- The concept used for the Velodrome National's building is industrialised building system (IBS) fabricated/pre-fab construction, modern method of construction (MMC) and off-site construction.
COMPONENTS
PRECAST COLOUMN
o Precast column used as connection that may be located between floors at a point of contraflexure or at floor level.
PRECAST BEAM
o Precast beam is the rapid solution to high quality, economical concrete floor construction.
PRECAST STAIRCASE
o The precast concrete staircase is designed for used in residential and commercial.
PRECAST SHEAR WALL
o The precast concrete wall system is very important for construction due to economical advantages.
PRECAST PARAPET WALL
o The precast parapet wall is made by mixing a strong cement – sand ratio.